Hi,
I am new to the site and have started refurbishing my bathroom. I have only started ripping the old one out and have posted some pics of the job so far. there's pics of how it was previously also.
I have done a bit of tiling before (my kitchen floor, splashback, my mums hall floor and kitchen floor and one other job) and although I have never done a full bathroom before I am quite confident of doing this. I have a friend who is a joiner and another who is a plumber who said they would help when I need them.
I plan on posting the progress on here and I appreciate all help given.
I started taking the tiles off the wall and fond another set of tiles underneath which was a pain but the top layer of tiles had been dot and dabbed on so came off ok with a gentle but firm hit with a hammer.
I had to take the external wall back to the brick as it will need re plastered. I am reluctant to rip the bath and shower out until this is done as I cant go too much further until then. I have a downstairs toilet so these have been removed upstairs.

I am new to the site and have started refurbishing my bathroom. I have only started ripping the old one out and have posted some pics of the job so far. there's pics of how it was previously also.
I have done a bit of tiling before (my kitchen floor, splashback, my mums hall floor and kitchen floor and one other job) and although I have never done a full bathroom before I am quite confident of doing this. I have a friend who is a joiner and another who is a plumber who said they would help when I need them.
I plan on posting the progress on here and I appreciate all help given.
I started taking the tiles off the wall and fond another set of tiles underneath which was a pain but the top layer of tiles had been dot and dabbed on so came off ok with a gentle but firm hit with a hammer.
I had to take the external wall back to the brick as it will need re plastered. I am reluctant to rip the bath and shower out until this is done as I cant go too much further until then. I have a downstairs toilet so these have been removed upstairs.