Yeah doesn't mean it couldn't be though.
It's the most commonly used screed these days over UFH And builders as we know don't always follow the rules.
Could just be a fibre reinforced screed but Id want to be sure what I'm dealing with before laying anything.

In answer to the original question With UFH commissioned and running It's possible to dry it out in about two weeks
You shouldn't force dry s&c screed
 
If time is an issue and cost is not an issue then use Ardex A38 (Ultra Rapid Drying Cement for Internal & External Screeds).

Screed the floor and tile after 4 hours. I believe it works out at 1.5 times more than the cost of normal screed.

I have not used this product myself, I got the info from asking the Ardex reps at a trade day.
 
Sorry for not replying earlier to clarify.

It will be a sand and cement mix. I honk I will go with the 21 days and ditra or similar. Bal do something called rapid Matt and it's only 1mm thick whereas ditra seems to be 3mm thick. Similar prices. Which should I use ?
 
Generally what moisture content should screed have if a decoupling matt is going over?

Would it not be similar to tiling?

IMO 21 days for a screed that thick is not long enough with regular sand n cement.
 

Advertisement

Thread Information

Title
How long to wait until tiling onto 75mm screed
Prefix
N/A
Forum
Canada Tile Advice
Start date
Last reply date
Replies
40

Advertisement

UK Tiling Forum

Thread statistics

Created
ashurst,
Last reply from
Geoff Thacker,
Replies
40
Views
35,968

Thread statistics

Created
ashurst,
Last reply from
Geoff Thacker,
Replies
40
Views
35,968
Back