How long to wait until tiling onto 75mm screed

Tilers Forums Official Sponsors

I'm guessing here but think bal not offering this product for green heated screed might be to do with the rate at which vapour will be released from the screed. Vapour management would be the way I'd go considering the ufh.
 
Antifracture mats are not suitable for use as a vapour barrier Andy, needs to be a product similar to Ditra or Dural. They allow moisture to escape via the cavities.

Yeah I know, I don't think there's any need for a moisture barrier unless it's stone going Down
 
Andrew, if it was porcelain tiles how do you see the water getting out? Would not a pressure build up?
 
i don't know really, maybe it never does. What are green screed adhesives for ? I've stuck insulation boards on a green screed using ultimate, confirmed ok by tilemaster!
 
Think bal green screed is 48hours. Most s2 adhesive are good for green screed too
Most s2 adhesives that i have used are horrible . But I gave up on them a few years back and do what ever is necessary not to use them . Are they any better now
 
Ultimate is the most user friendly one I've used, It's not actually that bad, I'm same tho I avoid s2 if possible
 
Most s2 adhesives that i have used are horrible . But I gave up on them a few years back and do what ever is necessary not to use them . Are they any better now
The single part s2s are much more user friendly than 2 part ones. Used Weber tm ultra and rocatex and all easy to use
 

Advertisement

Thread Information

Title
How long to wait until tiling onto 75mm screed
Prefix
N/A
Forum
Canada Tile Advice
Start date
Last reply date
Replies
40

Advertisement

UK Tiling Forum

Thread statistics

Created
ashurst,
Last reply from
Geoff Thacker,
Replies
40
Views
35,968

Thread statistics

Created
ashurst,
Last reply from
Geoff Thacker,
Replies
40
Views
35,968
Back