P
Prem Tiler
I've been asked to quote a half finished floor.
There 'builder' fixed 10m2 60x30 porc to the existing concrete substrate but continued it over 13m2 of parkay flooring with ever-bond. It didn't adhere so they now would like me to finish the job properly.
The parkay has been lifted and now there is a 10mm deffersit in floor level to match the tiles that are sound.
obviously SLC but that's alot of slc and extra work. I was thinking how about bringing the level up with another method.
Any ideas? I wondered if ufh insulation boards would be the cheapest fastest but soundest option? after all they are designed to tile on, easy to cut, and raise levels as a side affect of there use.
open to ideas men.
There 'builder' fixed 10m2 60x30 porc to the existing concrete substrate but continued it over 13m2 of parkay flooring with ever-bond. It didn't adhere so they now would like me to finish the job properly.
The parkay has been lifted and now there is a 10mm deffersit in floor level to match the tiles that are sound.
obviously SLC but that's alot of slc and extra work. I was thinking how about bringing the level up with another method.
Any ideas? I wondered if ufh insulation boards would be the cheapest fastest but soundest option? after all they are designed to tile on, easy to cut, and raise levels as a side affect of there use.
open to ideas men.