I'm probably asking a really silly question but here's my problem.
I've tiled a few rooms before and the way I start is to screw a piece of wood into the wall low down where the second row of tiles will start I make sure this is level with a spirit level so I have a straight and level foundation to start on and then when I've tiled the entire room I take the wood away and cut the lower tiles to fit. I don't like the idea of starting at the bottom as it will be difficult to ensure its level.
Now my method doesnt lend itself to a wetroom where I've tanked the wall as I don't want to compromise the seal by drilling holes for rawl plugs!. Where would you professionals begin?
Walls covered in ardex WPC, tiles are 300x600 porcelain. I have a laser level to assist
Thanks!
I've tiled a few rooms before and the way I start is to screw a piece of wood into the wall low down where the second row of tiles will start I make sure this is level with a spirit level so I have a straight and level foundation to start on and then when I've tiled the entire room I take the wood away and cut the lower tiles to fit. I don't like the idea of starting at the bottom as it will be difficult to ensure its level.
Now my method doesnt lend itself to a wetroom where I've tanked the wall as I don't want to compromise the seal by drilling holes for rawl plugs!. Where would you professionals begin?
Walls covered in ardex WPC, tiles are 300x600 porcelain. I have a laser level to assist
Thanks!