Most jobs I drop a new ceiling so I try and set out full tile from top. Works out most times
Really ..??? Sounds a bit extreme. .
follow_along_with_video_below_to_see_how_to_install_our_site_as_web_app
Note: this_feature_currently_may_not_be_available_in_some_browsers
Discuss Just read this and have an opinion please in the Australia Tiling Forum area at TilersForums.com.
Most jobs I drop a new ceiling so I try and set out full tile from top. Works out most times
Really ..??? Sounds a bit extreme. .
Putting a level on the ceiling extreme? LOL, takes 2-3 seconds mate.
Hi guys,
Ok so I have come to a forum to discuss this. Last 3 jobs I have done on full bathroom installations working with a plumber. We have had the odd argument as I am or consider myself to be a good tiler....
All tiles have come from B&Q supplied by customer. The last job, the grout line went out slightly so the ceiling have a a row that went into ceiling uneven. Not too bad but hey ho... Anyway, I looke at the second tile in on that wall and its bigger than than the first tile. That's what has knocked the line out. I followed that tile. Ive been having battles with them. They are differ in sizes. Its making my job 10 times harder. Is it me or what? Is this a known factor?
Last 3 jobs with B&Q tiles they all change in size and on this job im using 4m grout line to make it look better (hide it) which I don't like doing.
Advice?
Thanks
Putting a level on the ceiling extreme? LOL, takes 2-3 seconds mate.
Reply to Just read this and have an opinion please in the Australia Tiling Forum area at TilersForums.com