H
hillhead
I don't normally knock the power either, my lad said to me one day that he got a shock.
I laughed but he was adamant,lol, turned out there was a problem as every screw was live.
The builder was contacted and a spark was on site within 20 minutes !!!
I laughed but he was adamant,lol, turned out there was a problem as every screw was live.
The builder was contacted and a spark was on site within 20 minutes !!!