my wetroom diary!

UK Tiling Forum; Established 2006

Welcome to the UK Tiling Forum by TilersForums.com, built in 2006 by Tilers, run by Tilers.

View all of the UK tiling forum threads, questions and discussions here.

Tilers Forums Official Sponsors

Dagger, thanks for showing all of us how your job is going. I like seeing these shots of a typical install in the UK. It is a rare thing here in the US where the bathroom gets comprehensive waterproofing like you guys do on your jobs. :thumbsup:
 
I have just got off the telephone with my potential customer and given him the unfortunate news how much it will cost to remove and replace his "wetroom" and pointed him in the direction of this post,
so i hope he finds this informative and reassuring!

and thank you to you guys for all the input!

Dagger
 
Hello all!!

back to work today on the wetroom in SE London,

after a coffee and a minute or two i started tiling:

firstwallgoingup.jpg


Someone on this forum must have loved my advice about putting a sheet down after the first course was on the wall because i could not find that sheet ANYWHERE!

anyway, an hour or so later:

firstwallup.jpg


the next thing i had to do was put in the wall that goes over the entrance, always a little tricky so i reached for my phone to call my mummy, not really i just put the kettle on again!

after my beverage:

returngoingin.jpg


i start to put the wall up, still struggling with the +/- 2mm difference in size of the tiles. (b & q people!).

a bit later i had this:

returnin.jpg


and the other side:

othersideofdoor.jpg


and a bit of a wider angle:

doorwallwide.jpg


so, all that is left to do is the two returns and ceiling that forms the entrance to the wetroom, i will do them tommorrow and grout the lot.
siliconing and a small repair to the floor in the bedroom (i did not lay it or break it) will have to wait.

needless to say i wont be doing all that tommorrow!

thanks

Dagger.
 
Last edited by a moderator:
Hello all,

i had a bad start to today, i forgot my camera!
anyway, i had to go and see another job in the afternoon so i did not get as much done as i would have liked, and i did not have photos of what i had done!!!!

but for the sake of this post on my way back from the quote i grabbed my camera from home and headed off to the wetroom job:

this is the right hand side of the entrance:

rightsidez.jpg


and this is the left hand side:

leftsideakl.jpg


this is the entrance from a wide angle:

allthetrimswide.jpg


and this is the full entrance:

fulldoorway.jpg


as you can see all the doorway is mitred chrome trim and there is chrome trim on all external corners, and although meddling with the tile joins has been a problem.... for £10m2 these tiles look great!

anyway i hope you like it so far and i will put more piccys on tommorrow!

Dagger.
 
Last edited by a moderator:
I think it looks really good dagger, I'm also impressed with how clean you keep the job:thumbsup:
 
Excellent post, as a plumber this is obviously an area I am aiming to get in to. Good to see it in stages Thanks for taking the time and effort to picture and post :thumbsup:
:8:
Mick
 

Advertisement

Thread Information

Title
my wetroom diary!
Prefix
N/A
Forum
UK Tiling Forum
Start date
Last reply date
Replies
73

Advertisement

UK Tiling Forum

Thread statistics

Created
dagger,
Last reply from
Dan,
Replies
73
Views
15,061

Thread statistics

Created
dagger,
Last reply from
Dan,
Replies
73
Views
15,061

Weekly Email Digest

Back