Doing a large job last few weeks 280m2 with70m2 on floor on to original tiles in a wet changing room area that was a bit up and down, water was pooling where it should not have been. Anyway, I was tasked with doing the job and customer insisted they wanted the floor bang on level though out with nice falls in to the wet areas. I done the job using phil Hobson's method of screeding, it took about 50 bags of renovation screed then tiled it. Shop fitters commented when fitting there long spans of sports lockers that the floor was only 2mm out from one end to another. ... Phill you're a legend!!!! <br><br>