I am laying a porcelain (Grade 3 Homebase tiles) floor for 2 days. 12.5 sq m in a kitchen usual issues with multiple doorways and tiling into alcoves for some appliances (5 in this case). I was competing with another tiler for the quote - I usually get told I am more expensive. This time the customer told me I was way cheaper (under £400 for addy/grout/labour). The other tiler said it would take 8 days and cost £1000 and he had been recommended by a local tile shop. Guess he just didn't want the job!