D
diamondtiling
I have a job to do soon, I am ripping out two units on an Industrial estate, the spec is to leave the building as was when new. At the moment the floor is tiled, about 140 mtrs, I intend to remove all the tiles. Is there an SLC that will leave the floor strong enough for pallet trucks etc or will a screed be the best bet?
I might have to get the floor painted as well.

I might have to get the floor painted as well.