Went to start a bathroom today...
What a disaster.
1 new wall framed out in 4x2 cls & the other wall new plasterboard on existing studs
New wall out by 15mm across an 1800 level, joiners never bothered lining through the studs.
Plumber (allegedly) has butchered the new wall to fit his pipework instead of putting all in before the plasterboard went on, cut sheets about a meter up & never bothered to dwang the joins.
I have spent almost all day sorting out others work.
I'm not a multi trader but sometimes I feel like it.
What a disaster.
1 new wall framed out in 4x2 cls & the other wall new plasterboard on existing studs
New wall out by 15mm across an 1800 level, joiners never bothered lining through the studs.
Plumber (allegedly) has butchered the new wall to fit his pipework instead of putting all in before the plasterboard went on, cut sheets about a meter up & never bothered to dwang the joins.
I have spent almost all day sorting out others work.
I'm not a multi trader but sometimes I feel like it.