Edit May 2024: THIS is a New Show Us Your Work Thread for 2024 Onwards

This is the new Tilers Showcase Forum where we want new tiling work added, with each tiling job you complete having a thread of its own so people can see what kind of work you do, and potential customers can find your work



I thought it was about time we had a thread dedicated to all members of Tilers forums to show us any work that they do.

Be it from installing a kitchen to garden decking. Show us your work! Get those pictures taken, but then do something with them! Actually add them to a thread and some facebook groups with your website link in them etc and it'll help spread the tile love. 🙂

If you have done a job then please do share it with us.

Pics are a MUST as what is the point of sharing a job without them..:smilewinkgrin:.

So if you do a job and you take a few pics then please do share it with us.

Lets make it a big thread for all to view and input in.

Thanks Dave ..:thumbsup::thumbsup:
 
Last edited by a moderator:
Thanks, it took about 32 days including the floor
It's awesone work. Do you find yourself getting itchy to get done after 2 weeks though? Or do you have real patience and the enjoyment lasts all the way through the project?
Personally, I start out really excited but struggle sometimes to keep 100% motivated after a few weeks on one project!
 
It's awesone work. Do you find yourself getting itchy to get done after 2 weeks though? Or do you have real patience and the enjoyment lasts all the way through the project?
Personally, I start out really excited but struggle sometimes to keep 100% motivated after a few weeks on one project!
Its more about having had enough of working away and the traveling involved, it can depend on the site conditions too when youre on a job for a while.
 
Well what can I say Sharon, sleek and understated. Looks amazing, if that’s in a wellness centre you should feel 100% better when you come out
 
My first porcelain project. Ensuite refitted.
New floor in 18mm ply
Hardi 6mm
Ufh
Slc
Tiles600x300 .

Walls, shower area 12mm hardi plus tanking
Rest of walls moisture resistant plasterboard
Used levelling clips throughout but made a mistake as should have gone thinner and used regular spacers to get consistant grout lines.
Usrd mapei slow set adhesive & mapei medioum grey grout ( never again as shading / patching was terrible - took ages to get it looking acceptable.
Thanks to all on here who helped guide me with methods & products. Main bathroom next!

4ABD95B8-D0AB-4CC3-AAD9-FB6DB68322AF.jpeg 79322F84-C599-47B9-8FEF-7B7B2F5156E7.jpeg 3D1B5005-7E37-48AD-B01B-A3E6D8DF6BB7.jpeg 0072109A-CD4C-48AD-BFE2-DB7152BE2B3F.jpeg 6E089BF3-E9E0-4C85-88AC-1A9F592540BA.jpeg 69BED581-0572-49B9-A810-91F56C28075E.jpeg CF198067-001A-4A90-BF70-343E0EA4967E.jpeg 7B2639C7-397E-495D-9687-237A6BF1E41A.jpeg F75109A7-7C3E-4927-BEA4-3B3A337910FD.jpeg
 

Advertisement

Thread Information

Title
Show Us YOUR Work Thread - Tilers Pictures
Prefix
N/A
Forum
Tiling Work Showcase Forum
Start date
Last reply date
Replies
3K

Advertisement

UK Tiling Forum

Thread statistics

Created
Dave,
Last reply from
Old Mod,
Replies
2,513
Views
500,628

Thread statistics

Created
Dave,
Last reply from
Old Mod,
Replies
2,513
Views
500,628

Weekly Email Digest

Back