Removal
Remove Existing Basin, Toilet and Bath (To be reused but not taps)
Remove Existing Shower Enclosure, Tray (To be disposed)
Remove Electric Shower (To be Reused)
Remove Towel Rail (To be Resused)
Remove existing tiling (currently only around shower, top of bath and top of basin)
Remove Skirting Board (To be disposed)
Tiling
20m2 of wall tiling (tiles to be provided but not adhesive & Grout etc)
5m2 of Floor tiling (tile to be provided but not adhesive & Grout etc)
Floor needs to be sorted as previous fitter tiled straight onto of floor boards and some have come up. Believe it should be boarded and some flexible adhesive put down)
Plumbing
All plumbing is in the right places for refit but would like existing checking and removal of current plastic push joints as I have had a few fail.
Re fit
Fit Original Basin (New Tap Supplied)
Fit Original Toilet
Fit Original Bath (New Tap Supplied)
Fit New Shower Tray, Enclosure & Waste (All supplied)
Fit Towel Radiator
Probably fit a mirror and possibly a cabinet or shelf (Will be supplied)
The majority of this job is labour and tiling as I will supply all main parts apart from the consumables such as the things for the floor, grout adhesive, plumbing joints etc I would estimate a day for removal and make good, 1.5 days for tiling and a day for refit suite.
- - - Updated - - -
heres another....what you reckon !
I have never tried tiling before although have done a bit of plumbing and started fitting our downstairs bathroom which consists of a walk-in shower (new walls and tray in and fitted), a toilet (plumbing sorted just needs fitting) and small sink (fitted). I have tiled the floor and not quite half the walls. The trouble is I'm working long, long hours and just don't have the time to finish it in the evenings and its dragging on now. I really need someone to finish the project for me so i can concentrate on other things that need doing as we are looking to possibly move on. All materials are ready for use so it would just be labour required.
Removal
Remove Existing Basin, Toilet and Bath (To be reused but not taps)
Remove Existing Shower Enclosure, Tray (To be disposed)
Remove Electric Shower (To be Reused)
Remove Towel Rail (To be Resused)
Remove existing tiling (currently only around shower, top of bath and top of basin)
Remove Skirting Board (To be disposed)
Tiling
20m2 of wall tiling (tiles to be provided but not adhesive & Grout etc)
5m2 of Floor tiling (tile to be provided but not adhesive & Grout etc)
Floor needs to be sorted as previous fitter tiled straight onto of floor boards and some have come up. Believe it should be boarded and some flexible adhesive put down)
Plumbing
All plumbing is in the right places for refit but would like existing checking and removal of current plastic push joints as I have had a few fail.
Re fit
Fit Original Basin (New Tap Supplied)
Fit Original Toilet
Fit Original Bath (New Tap Supplied)
Fit New Shower Tray, Enclosure & Waste (All supplied)
Fit Towel Radiator
Probably fit a mirror and possibly a cabinet or shelf (Will be supplied)
The majority of this job is labour and tiling as I will supply all main parts apart from the consumables such as the things for the floor, grout adhesive, plumbing joints etc I would estimate a day for removal and make good, 1.5 days for tiling and a day for refit suite.
- - - Updated - - -
heres another....what you reckon !
I have never tried tiling before although have done a bit of plumbing and started fitting our downstairs bathroom which consists of a walk-in shower (new walls and tray in and fitted), a toilet (plumbing sorted just needs fitting) and small sink (fitted). I have tiled the floor and not quite half the walls. The trouble is I'm working long, long hours and just don't have the time to finish it in the evenings and its dragging on now. I really need someone to finish the project for me so i can concentrate on other things that need doing as we are looking to possibly move on. All materials are ready for use so it would just be labour required.