W
White Room
well in the old days you would drill holes at the top every 150mm put a small hose throught the holes atached to a funnel then you would mix unibond with 70% water and pour in then you would go down half way drill holes again and repeat leave three days to dry with the lime plaster and hores hair and lathes it would harden like concarete give wack with hammer to test its strengh then tile
what!!!!!