Tiling onto Ply, can it be a success?

Tilers Forums Official Sponsors

I have seen this twice before, there was a poly layer between joists and ply for moisture.
But maybe that was one because the finished floor was timber, can’t remember but worth checking.

Why not stick and screw 6mm Hardie backer to the floor before tiling instead of the Ditra.
 
my main concern is is the floor under the ply completely dry!
this is what will happen if you trap moisture under Ditra onto ply.
WP_20130418_003 (2).jpg
 
I have read a lot of conflicting opinions on using S2 over Ditra. I decided to go with Ultimate S2 as I read US and UK specs are different and S2 is suitable according to UK spec.

I did think the screed was anhydrite but from a quick Google search it seems it's not. It is a dry mix with fibre glass reinforcement and was shovelled in and packed in between joists and compressed.

The heating works perfectly, UFH manifold flow temp set at 50 degrees, the house is warm and our living has laminate which is warm to touch. Takes around 1 hour to heat up to temperature.

I also chose a 3mm V notch as this is what is specified by Ardex, should I go larger notch? I may need another tub if so.

Thanks for the replies.
 
... and to be honest, you’ll struggle to use Ultimate and not throw most away.
And to use that over top of Ditra, you’ll be lucky to return 3m2 a bag.
You’re looking at approx 15 bags to be sure you have enough.
 
What’s the reason for S2 being unsuitable?
 

Advertisement

Thread Information

Title
Tiling onto Ply, can it be a success?
Prefix
N/A
Forum
DIY Tiling Forum
Start date
Last reply date
Replies
51

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
AD1,
Last reply from
Dan,
Replies
51
Views
14,086

Thread statistics

Created
AD1,
Last reply from
Dan,
Replies
51
Views
14,086

Weekly Email Digest

Back