Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroom

Tilers Forums Official Sponsors

D

Deleted member 1779

OK so we may sponsor this forum but we are not aloof and we dont sit
up here in our ivory tower while you poor readers have to get down and
dirty with your own projects...

Oh no EVEN WE have to put our hands into the dirt, roll up our sleeves
AND DO A BATHROOM !

I intend to do this project in stages and I am taking pics as I go.

The brief on this one is to strip out the bathroom, strip out the kitchen
plumb in a new combi boiler and remove the tanks to give space.

OK here we go. First off in the Bathroom

31050_385277582013_617362013_4007080_8310237_n.jpg

This beauty is taking up a bit of space so its going....
But we have to make room in the kitchen for a new boiler

31050_385276527013_617362013_4007001_4150788_n.jpg

I've just taken off the kitchen cabinets and first thing is that
there is a great lump in the plaster exposing the bricks.

31050_385276537013_617362013_4007002_899949_n.jpg


Patched with a piece of plasterboard and a bit of thistle !
(Do you like my plastering...) Now thats ready for the gas fitter who will be
on site on Monday.

31050_385276547013_617362013_4007004_4648888_n.jpg

Back to the bathroom and theres that tank again!
Wont be around too much longer.

31050_385277557013_617362013_4007075_1803418_n.jpg

Dirt on my nose? WHAT WORKING????
Time to grab the Timotei from the pile of rubble...

31050_385277562013_617362013_4007076_6293102_n.jpg

I am not a tidy worker !

31050_385277572013_617362013_4007078_5964622_n.jpg

What a lovely ADVACADO sink...

31050_385276572013_617362013_4007008_316246_n.jpg

Going....

31050_385276612013_617362013_4007016_1833247_n.jpg

Gone...

31050_385277537013_617362013_4007073_569437_n.jpg


I love my sledge hammer... Thats the shower tray gone.

OK thats it for now. I will take pics as this project progresses and
post up. Then you will be able to laugh at my efforts and hopefully
share my pain !
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Im quite happy to get rid off that big old boiler for you save room in the skip and all that......:smilewinkgrin:
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

look forward to the next pic's.sledge hammer.hope you had your goggles on,not just the ear defenders,i tend to tidy as i go,less chance of sharp tile bits flying about the place.young lad working with us last week had big pile of broken tiles on the floor,dropped his lump hammer , tile shard flew up and cut him.he now understands why i told him to bag up as he goes.
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Vaillant, quality boilers.thats all i fit
Nice one! - I did consider the potterton but this is good

Just got back in from another 6 hour stint.... Forgot my camera!

Going back in the morning so will do a bit of a snapshot of the work
done yesterday and today.

PS: My back hurts... My hands hurt... My head is full of plaster dust...
(Ahhhh)
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Nice one! - I did consider the potterton but this is good

Just got back in from another 6 hour stint.... Forgot my camera!

Going back in the morning so will do a bit of a snapshot of the work
done yesterday and today.

PS: My back hurts... My hands hurt... My head is full of plaster dust...
(Ahhhh)
welcome to our world Richard, apart from the short shift lol
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Latest installment.

1) Bathroom. Room is now plastered. Thats drying so not much can be done in here for a while...

29490_393754932013_617362013_4225168_3707464_n.jpg


WRONG TILES HAVE BEEN ORDERED !!
Should have been 300 x 600. However 300 x 400 arrived. Going back Monday

29490_393754962013_617362013_4225174_457675_n.jpg


On to the kitchen then and its time to get that wall straight.

29490_393754862013_617362013_4225158_3763292_n.jpg


What a mess.... Here we go !

29490_393754977013_617362013_4225177_4551_n.jpg

Almost there.....

29490_393754982013_617362013_4225178_5481446_n.jpg


And finished... Thats the wall almost back to blockwork. Its as level as I can get it with all those mutli layers...

29490_393754987013_617362013_4225179_6616894_n.jpg

Cup of tea time I think !

29490_393754857013_617362013_4225157_3598312_n.jpg


My little portable fridge is a blessing with the milk. Bargain !
29490_393754907013_617362013_4225164_4372158_n.jpg

Shower tray has arrived but still cant do much in the bathroom yet.


29490_393754882013_617362013_4225161_5178933_n.jpg

Time to move to the living room now.
Jobs to do.
1) Strip out the skirting boards.
2) Remove coving
3) Chase out walls for new double sockets.

29490_393754927013_617362013_4225167_3081422_n.jpg


Nope... That bathroom wall is going to take some time....
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

weres the job m8te im in kent if its nere me ill sort your plastering out try a plaster heater works a gooden
 