Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroom

Tilers Forums Official Sponsors

D

Deleted member 1779

OK so we may sponsor this forum but we are not aloof and we dont sit
up here in our ivory tower while you poor readers have to get down and
dirty with your own projects...

Oh no EVEN WE have to put our hands into the dirt, roll up our sleeves
AND DO A BATHROOM !

I intend to do this project in stages and I am taking pics as I go.

The brief on this one is to strip out the bathroom, strip out the kitchen
plumb in a new combi boiler and remove the tanks to give space.

OK here we go. First off in the Bathroom

31050_385277582013_617362013_4007080_8310237_n.jpg

This beauty is taking up a bit of space so its going....
But we have to make room in the kitchen for a new boiler

31050_385276527013_617362013_4007001_4150788_n.jpg

I've just taken off the kitchen cabinets and first thing is that
there is a great lump in the plaster exposing the bricks.

31050_385276537013_617362013_4007002_899949_n.jpg


Patched with a piece of plasterboard and a bit of thistle !
(Do you like my plastering...) Now thats ready for the gas fitter who will be
on site on Monday.

31050_385276547013_617362013_4007004_4648888_n.jpg

Back to the bathroom and theres that tank again!
Wont be around too much longer.

31050_385277557013_617362013_4007075_1803418_n.jpg

Dirt on my nose? WHAT WORKING????
Time to grab the Timotei from the pile of rubble...

31050_385277562013_617362013_4007076_6293102_n.jpg

I am not a tidy worker !

31050_385277572013_617362013_4007078_5964622_n.jpg

What a lovely ADVACADO sink...

31050_385276572013_617362013_4007008_316246_n.jpg

Going....

31050_385276612013_617362013_4007016_1833247_n.jpg

Gone...

31050_385277537013_617362013_4007073_569437_n.jpg


I love my sledge hammer... Thats the shower tray gone.

OK thats it for now. I will take pics as this project progresses and
post up. Then you will be able to laugh at my efforts and hopefully
share my pain !
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Job is in HARLOW. But at the moment everything is under control...
The plasterer is a good friend of mine, Glenn and has worked with me for years.
But thanks for the offer. Appreciate it. Always good to know the trades are out there

Latest Pics... While we wait for that bathroom plaster to dry out there are other jobs to do.

29490_393796497013_617362013_4226595_3954278_n.jpg


Coving coming off the living room ceiling. Going to skim this lot.

29490_393796507013_617362013_4226596_8323812_n.jpg


Skirting boards also ripped out....

29490_393796522013_617362013_4226598_4268498_n.jpg

Closer look.

29490_393796602013_617362013_4226608_5194041_n.jpg

Time for a new electrical socket

29490_393796607013_617362013_4226609_7415609_n.jpg

Cant leave the drills alone...

29490_393796612013_617362013_4226610_1889236_n.jpg


Job done.

29490_393796617013_617362013_4226611_825282_n.jpg


Aaaaannd.... A CUP OF TEA ! In the luxury living room furniture.

Bathroom Plaster is still drying out and we are waiting for the tiles to be replaced with the 300 x 600 instead of the 300 x 400
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Todays update...

28252_398091222013_617362013_4342910_7614132_n.jpg

Shower tray cut into the plaster and setback ready for tiling.

28252_398091182013_617362013_4342904_626705_n.jpg

Different angle. View from bathroom door to where that old cupboard was with the central heating hot water tank.

28252_398091187013_617362013_4342905_6849222_n.jpg

Toilet now relocated and plumbed in to main sewer.

28252_398091192013_617362013_4342906_6517097_n.jpg


We're getting there....

28252_398091197013_617362013_4342907_4511364_n.jpg

Tile laid out. 600 x 300 ceramics.

Going to be laid as a brick bond pattern.

28252_398091207013_617362013_4342908_1233329_n.jpg

Wider shot.
27950_389992532013_617362013_4126374_6972438_n.jpg

Remember when it looked like this......
28252_398091212013_617362013_4342909_1891159_n.jpg

Ceiling is overboarded 9mm plasterboard (nothing special) Skimmed and then painted with two coats of white.

Another day over
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

hope you primed that ceiling first:smilewinkgrin:

Keep up the good work :thumbsup:
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Nice of you to take time to submit photos of the job mate.


Looking forward to seeing the end result


Is the shower area being tanked when the plaster is dry.??

Are those tiles within the 20kg weight limit for plaster skim.??

p.s. a mini fridge is the way forward on some jobs. keeps your shandy bass cold.
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Cheers Gazebo. Well here are some more for you guys (1st July 2010)
Here we go...
34994_399303292013_617362013_4371153_5080870_n.jpg

Its the shower wall tiled (no door or screen yet)
34994_399303297013_617362013_4371154_4092348_n.jpg

And this is the wall tiled for the sink and toilet.
34994_399303197013_617362013_4371134_900260_n.jpg

Tiles around the doorway. I would have done away with the architrave and used tile trim but not my choice.
34994_399303262013_617362013_4371147_96392_n.jpg

Bottom of the tile rows showing the shower tray
34994_399303277013_617362013_4371150_1726219_n.jpg

Corner of bathroom
34994_399303227013_617362013_4371140_1723869_n.jpg

The sink unit is looking nice
34994_399303222013_617362013_4371139_2216188_n.jpg

And a bit of a well known tap
34994_399303242013_617362013_4371143_2345698_n.jpg

Helps with a small bathroom
34994_399303287013_617362013_4371152_4099795_n.jpg

Just needs grouting now!
(PS: The window section has been left because in 7 weeks time new windows to be fitted so ripping out. Space left for tiles and window sill.
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

could you not gone full tile of the bath??, or got a bigger cut upto the ceiling??
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

I think the centre line was taken from the window due to the cabinets being in place

34994_399303297013_617362013_4371154_4092348_n.jpg

Which may have upset the balance of the ceiling / floor tiles.
I will have to measure the floor tile to see if was feasible to have put a
full tile to the ceiling.

34994_399303162013_617362013_4371127_7199807_n.jpg

Toilet has now come out of its room.

34994_399303152013_617362013_4371125_3917341_n.jpg

Cuts a lonely figure outside as it waits for the dump !

34994_399303172013_617362013_4371129_1032017_n.jpg


New loo looking a little bit more modern in white than advacdo

34994_399303247013_617362013_4371144_6731692_n.jpg


So they have someone at the factory testing them...
Must drink a lot of water.

34994_399303257013_617362013_4371146_4348556_n.jpg


Shower tray in and ready for lino to be fitted to floor

34994_399303237013_617362013_4371142_5099184_n.jpg


34994_399303212013_617362013_4371137_6097611_n.jpg


Some extra shots
 
Re: Tiling Project. A bathroom from start to finish.. TOTAL refurbishment of bathroo

Richard you are doing such a good job and then you spoil it by posting a picture of you reading 'the news of the world'

I would have thought you were a Times man like all us other intellectuals.


:joker:
 