S
slikt
I have just done my flooring and I have installed UFH, i've had loads of conflicting advice even from Mapei. . So. . . should I switch it on yet or wait another week?
Flooring is as follows. . .Primed floor with 2 coats SBR, Laid insulation boards on Mapei proflex (Grey), then UFH mat, used Mapei Renovation screed over the top, left a day and then used Mapei Proflex (white), used a 20mm round notched trowel, left a day and grouted. That was 17-18 days ago, can I fire it up, or wait at least 3 weeks, I only ask as I have had people tell me wait from 3 days to 28 days and everything inbetween. . so i'm slightly confused and have bloody cold feet
Flooring is as follows. . .Primed floor with 2 coats SBR, Laid insulation boards on Mapei proflex (Grey), then UFH mat, used Mapei Renovation screed over the top, left a day and then used Mapei Proflex (white), used a 20mm round notched trowel, left a day and grouted. That was 17-18 days ago, can I fire it up, or wait at least 3 weeks, I only ask as I have had people tell me wait from 3 days to 28 days and everything inbetween. . so i'm slightly confused and have bloody cold feet