Adam18Spring
TF
Hi all
In a kind of 'Payment' for all the advice i have got from here i have decided to do a build thread for my wet room, it may help someone in the future it may not but here it goes!
Room size is 1.8M x 2.2M, at the end of the extension i finished building a last year. I work full time so this may take a while as it will just be me doing this...
Screed is an anhydrite screed currently 50mm below finished floor level, i shuttered of 150mm before the screed went in to accomidate the drain.
With that let's start with the blank canvas.
You can see the shuttered off area here
Ceiling already plastered
And placing the toilet roughly where it will live..
So first up we need to get our services in:
Toilet Overhead Cisten
Hot/Cold for sink
Feed to Wall mounted shower
Feed to wall mounted wand flexi shower thing
The shower will be digital so also some Cat5
Planning the pipe routes
As i am battening and boarding (Didn't feel i could get the finish i wanted with the DotnDab) i only needed to recess the surface mounted clips to just below the batten depth of 18mm. So with that in mind:
Next up was making the copper pipework.
Now, i had no soldering iron but i can just about TIG Weld... Just Dan, just....
So making the pipes
And welded
Got slightly awkward lol
This was surprising! One bit of new old stock 15mm from 1989 and the other from 2018!
So with the pipework made i pressure tested it all to 4Bar...carefully...
Then clipped it all in place
Next up was the extraction, used a 100mm inline fan from Vent-Axia
Time to make a hole and get it mounted
Mounted in the void and 100mm hole drilled
Solid 100mm Cavity pipe inserted and flexi added to the end for the bend using aluminium ducting tape
And fitted
And sealed to the fan, just the wiring to do and the drop down for the fan inlet
Next up i drilled the holes for the spot lights, out came the trusty china laser level...
Nice line so the spots will be in-line...
Further updates tomorrow folks, got some more done, just need to edit it
In a kind of 'Payment' for all the advice i have got from here i have decided to do a build thread for my wet room, it may help someone in the future it may not but here it goes!
Room size is 1.8M x 2.2M, at the end of the extension i finished building a last year. I work full time so this may take a while as it will just be me doing this...
Screed is an anhydrite screed currently 50mm below finished floor level, i shuttered of 150mm before the screed went in to accomidate the drain.
With that let's start with the blank canvas.
You can see the shuttered off area here
Ceiling already plastered
And placing the toilet roughly where it will live..
So first up we need to get our services in:
Toilet Overhead Cisten
Hot/Cold for sink
Feed to Wall mounted shower
Feed to wall mounted wand flexi shower thing
The shower will be digital so also some Cat5
Planning the pipe routes
As i am battening and boarding (Didn't feel i could get the finish i wanted with the DotnDab) i only needed to recess the surface mounted clips to just below the batten depth of 18mm. So with that in mind:
Next up was making the copper pipework.
Now, i had no soldering iron but i can just about TIG Weld... Just Dan, just....
So making the pipes
And welded
Got slightly awkward lol
This was surprising! One bit of new old stock 15mm from 1989 and the other from 2018!
So with the pipework made i pressure tested it all to 4Bar...carefully...
Then clipped it all in place
Next up was the extraction, used a 100mm inline fan from Vent-Axia
Time to make a hole and get it mounted
Mounted in the void and 100mm hole drilled
Solid 100mm Cavity pipe inserted and flexi added to the end for the bend using aluminium ducting tape
And fitted
And sealed to the fan, just the wiring to do and the drop down for the fan inlet
Next up i drilled the holes for the spot lights, out came the trusty china laser level...
Nice line so the spots will be in-line...
Further updates tomorrow folks, got some more done, just need to edit it