Hi guys!
Next up we have the floor! In the last update i go the linear drain in it's position. So next up was building the floor falls. I didn't want a tray because i preferred to make it.
🙂
So, the floor with Linear drain
So, time to remove the Anhydrite screed lattice.
Killer angle grinder!
And removed:
Next up was time to make the falls, 20mm per meter for the first meter to the drain then 10mm per meter for the rest of the floor.
Jig'ing and welding the former:
Wall Fixing
Former welded and in place
Side rails done
Rear Rail
Now i had a form in place to screed to i needed to primer the floor
Next up was the screed
First up i used Mapei floor adhisive to bond the screed to the floor/primer then a sharp sand 3/1 Mix with SBR.
Drain Masked off first of course
Here you can see the adhisive before the screed was compacted ontop
And done