Hi Guys,

I am working away at the moment and had a tiler in doing the bathroom. The tiles are 600*300 Youngstone laid in landscape in porcelain from CTD in two colours - light in the middle (4 high) with dark top (1.5) and bottom (2) - with strips of square glass mossiac inbetween the different colour changes (so two strips)

The first weekend I got home and looked at what I could see and had to pull him up on the fact that he bad but the quarter round beading over both the cut outs for the hinges and also over the door catch striking plate. Could not really tell what the rest was like due to it still being battened out.

last weekend - I got home and found a mess basically.He had osrted the hinges out but not the striking plate

He has tilled the wall around the window. at the bottom he is quite on although the cut edges are very rough and uneven. On the left hand side of the window, the tile edge runs away from the window to stand proud by a aprox 1cm from the window edge. Also, along the top and down the right hand side edge he has used spotting. I have checked with my own spirit level (2 mtr) and found that it is the tiles that are angled away from the wall - not vice versa. In the top right hand corner of the window I can stick my little finger in towards the first knuckle and you can actually look down the gap and see the spot fixing and bare wall and tiles. I also do not see how he can put the beading

Also, worringly you can look down the gap and see the bits of board he has had to use to pad out for the glass beads.

We have had him leave out the tiles around where the bath is going to be fitted, and where the head of end of the bath is you can feel a simular gap where you can get a little finger in. It also appears that he has only used a 6mm bed from what I can see

Also, there is differences in levels - ie the bottom two tiles are forward of the 4 beige above by about 4-5mm leaving a noticable ledge, and a lot of the glass mosaics are very proud or sunk and even twisted.

I would say that out of the whole room, one wall is good.

Now I have approached him on this and he has blamed the walls. However, I prepped the walls, removing the old tiles, the emulsion (was only half tiled), making good, WPB tanking etc and although I would say they weren't totally perpindicular there were in a pretty good condition. 2 walls are wet plastered and two are plasterboard on studs (screwed). He told me that he has had to spot out up to 1/2" behind some tiles, and there is nothing he can do about it.

To me it looks like he has gone out with a tile and then it has grown bigger and bigger - perhaps because of the 6mm bed.

He also planed the door edge (not the top or bottom) and kn%&"*ered that so we need a new door now:furious3:

So here are my questions

1. Should the tiler inform you before starting if the walls are out (I believe yes to indemnify himself)
2. Grouting - these are a rectified edge tile - should it be grouted to the surface?
3. Should the grouting be done before the job is finished and should the grouting go the full thickness of the tile/mosaic (as ours isnt even 1mm thick in places you can stick your nail through it).
4. What come back have I got on the guy ie if we need to have tiles removed etc.. to put the job right

This guy has been trading for a few years (lives local)

All help and advice welcome

Cheers

Steve
 

Attachments

  • wall design.JPG
    wall design.JPG
    29.2 KB · Views: 258
If he wasnt happy with the walls he should have fixed them before he started and charged u for the prep work. Have u paid him?

john

Have paid him 350 with 150 outstanding.

as for photo's - I am in Germany and the bathroom is in North Wales.

My wife is very concerned about what is needed to be done to rectify it and perhaps wants to take the ostritch approach to problem management.

Trouble is we spent about 900 on the tiles....

Steve
 
He didn't turn up on a horse did he?

By the sounds of things you might want to check which adhesive he used if he supplied it. Make sure everything is right.

Trim on sill sounds frightening.

Like previously said he should have definatley informed you on state of Walls prior. Sensible thing to do.

Let us know what he says.

Hope you get it sorted.

In future there are loads of tilers on here who are more than capable and it's easy to tell who the better ones are and I'm sure there's someone local.
 
He didn't turn up on a horse did he?
no - he walked but I thought that was the sound of loose change in his pockets - not spurs :yikes:

By the sounds of things you might want to check which adhesive he used if he supplied it. Make sure everything is right.
Funny enough - I took a load of his rubbish to the tip - not one bag in it although the wife did confirm that he was mixing and not tubbed

Trim on sill sounds frightening.
there is no trim on the sill yet - and I can't see how could get one on with the gap on one side and the overhang on the other.

Like previously said he should have definatley informed you on state of Walls prior. Sensible thing to do.

Let us know what he says.

Well he has said to the misses that he wants to take a picture for his portfollio, and as I put earlier he has said there is nothing he can do

Steve
 
Steve

If. Your unhappy withjob I would try and backheel the final payment. Roughly a days labour for a more competent tiler . Who may be able to make good of a bad situation.

At end of day your the one who will have to look at it every Morning. Only a matter of time before you change the tiles.

A lot of outlay for work/materials already so worth paying little more to put right. Sound out a local guy on here who may come round and give better judgement . The way things are this time of year, someone will have to time.

As for getting 350 back. Slim to none unless he admits he ballsed up. Which is unlikely. A couple I have recently worked for had a builder knock them up quite a big extension. Turned up with a bucket of tools and no vehicle. Sent his wife to b and q for sand cement etc. Anyway the building was a bodge couldn't get it signed off and roof had to be completely changed. T
15k over budget and they tried to sue but advised by law firm it was not worth doin. Unfourtunate but lives and learns.

Hope you get it sorted.

Sean
 
Agree that pictures are needed, to give us some idea of whats going on.
Why has your tiler needed to plane the door down?
If i'm reading this correctly the tiling is being done BEFORE the bath has been fitted and first fix plumbing finished, why?
Hope you get it sorted.
 
Agree that pictures are needed, to give us some idea of whats going on.
Why has your tiler needed to plane the door down?
If i'm reading this correctly the tiling is being done BEFORE the bath has been fitted and first fix plumbing finished, why?
Hope you get it sorted.

All pipes are in there already. The bath side panel can't be cut to height, and has to be exactly the right height above the tiles to fit - it is a 3d shaped panel coming out on a P bath (starts from normal width of a bath). Bit of a pain I know but plumber said he needed the floor tiles in to get the exact height. Also, the bath sits on hooks which will need building round with hardi-backer once fitted to cover them before tiling.

Steve
 
Last edited by a moderator:

Advertisement

Thread Information

Title
What a bodge up in the bathroom
Prefix
N/A
Forum
Bathroom Tiling Advice
Start date
Last reply date
Replies
65
Unsolved
--

Thread Tags

Advertisement

UK Tiling Forum

Thread statistics

Created
lawrenso,
Last reply from
Olz,
Replies
65
Views
4,447

Thread statistics

Created
lawrenso,
Last reply from
Olz,
Replies
65
Views
4,447

Weekly Email Digest

Back