Discuss What went wrong...? in the Australia Tiling Forum area at TilersForums.com.

Z

zoemac

Thanks Alun - the problem is proving anything - I guess I could blame the tile shop as I described exactly what I needed and they recommeneded SBR + cement adhesive rather than a gypsum adhesive. I could blame by builder who also did the tiling - was the SBR applied to thickly, was the floor dry enough to be tiled. I could blame the screed people - was there a fault with the screed? But how do I actually prove what the problem was and who was at fault? It is going to cost me at least £3500 to put right - money the I don't have right now - but I can't see the tile shop, builder or screed company volunteering to contribute.
 
Last edited by a moderator:
M

Mr Tiler

There's a good chance it was not dry. Natural drying would need around 20 degrees and 60% rh. The choice of adhesive puts you at risk and whilst SBR can be used it is sensitive to moisture as well. Sanding the floor to remove Laitance and any other surface detritus is essential for correct preparation. If the tiles are coming up clean it is a printer failure as that is the bit that is supposed to stick to the screed and the adhesive sticks to that in turn. You will need to lift the tiles and replace them. I would use a gypsum based adhesive. There are loads about and they are no more expensive than cement based these days.

you know your stuff mate
 

CJ

TF
Arms
444
1,088
Somerset
Local to me is a large 5 bed bungalow, that was having a small extension to the dining room. This bungalow is totally tiled. Extension was finished, and when everything was done, I had to extend the original tiling. This place had the older Anhydrate screed when built about 20 years or so........ALL the tiled floors are floating. The whole place has debonded.........it's like walking on a thin sheet of suspended ply. I had to lift a few damaged tiles in this extension, and didn't need any tools at all. The laitence had not been removed AT all. Cement solid on back of tiles.......floor totally clean.....but dusty.

It would cost thousands to put right now..........rough guess, about a 90m. I'm still waiting on that job. :)

This was also done by the original builder, who assured the guy "he knew wot he was doing"

Obviously NOT.
 
D

Dash J

What you are describing does not sound like Laitance. It sounds more like segregation which is a screed defect. You should not scabble screeds. They should be mechanically abraded which usually means sanding.

When I say scabbled that's what I mean alan,mechanically sanded
sorry for confusion,my words are not the greatest sometimes,got the two mixed up
 

AliGage

TF
Esteemed
Arms
Subscribed
4,531
1,188
Peterborough, England
I don't know an awful lot about these screeds so won't really comment. However, it sounds like there may have been a few errors. Leaving latence to ither guts to advise on, the picture you show once the screed is primed looks to me like the SBR was applied heavy and undiluted. Anyone else?
 

John Benton

TF
Arms
2,203
1,138
Leeds
Going back approx. a year I was doing a couple of bathrooms for a customer when his neighbour came round and asked me to look at a problem with his newly laid floor in the large kitchen\diner extension had just been built.

Tiles were lifting in the same way yours are. When I asked how the floor heating was commissioned he looked at me as if I'd called him a Man U fan. The tiles had been fixed before the floor was full dry. This was the result of not having a fully dry floor.

Tile1.jpg
The green is the primer that had lifted from the screed in the same way yours has!

The result being that the kitchen had to be removed, 90m of tiles skipped and re-fixed again. All this was done at the builders expense, he held his hands up and paid for it all (quite a reputable local builder btw).

Good luck but I suspect the whole floor will have to come up, and I don't think anyone will hold their hands up and take responsibility by the sound of things.
 

Reply to What went wrong...? in the Australia Tiling Forum area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

I'm planning on tiling my porch, and the tiles and adhesive will take up around 13mm of height...
Replies
2
Views
734
Hi. We've had a bathroom installed with electric mat underfloor heating in a new extension. The...
Replies
6
Views
344
Had new bathroom by a builder who has subsequently gone bust and after 6 months the floor has...
Replies
4
Views
240
    • Like
Hello, this is my first post here, but I have been doing some reading. I am going to be tiling...
Replies
7
Views
510
Hi All Had a panic when we had to rip out some of our floor tiles after a plumbing leak...
Replies
0
Views
424

Advertisement

Thread Information

Title
What went wrong...?
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
39

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.8%
  • Kerakoll

    Votes: 15 9.6%
  • Ardex

    Votes: 11 7.1%
  • Mapei

    Votes: 46 29.5%
  • Ultra Tile

    Votes: 19 12.2%
  • BAL

    Votes: 37 23.7%
  • Wedi

    Votes: 4 2.6%
  • Benfer

    Votes: 2 1.3%
  • Tilemaster

    Votes: 21 13.5%
  • Weber

    Votes: 18 11.5%
  • Other (any other brand not listed)

    Votes: 17 10.9%
  • Nicobond

    Votes: 7 4.5%
  • Norcros

    Votes: 3 1.9%
  • Kelmore

    Votes: 4 2.6%
Top