Sorry I meant to say floor uplighters, slip of the brain!
Have we had any quotes from any local tilers? How come you didn't give the plastering a bash?
No, I will dig out the areas and maybe someone could give me a rough ball park figure?
Tiling I am more confident with, I can take my time, set it out, think about it, stop if necessary. Plastering is a whole different ball game, it needs to be done in large areas, with speed and you can't stop and come back to it. It's taken a plasterer a month to do, if it took me 3 times as long that would be too long. If it takes me 3 times as long as a pro tiler I can live with that.
There's 45 sqm on the walls and 22sqm on the floors, mainly medium to large format porcelain tiles, what would be a ballpark figure for a good tiler to do that, labour only out of interest?