Tilers Forums Official Sponsors

macten

TF
Esteemed
Arms
After splitting up with my missus my heart hasn't been on working that much but this bathroom was pre-booked and it has helped me take my mind off things.

Never really took any before photos but it was a maroon suite with a block wall separating the toilet and bathroom. We removed airing cupboard/hot water tank and while my Corgi mate installed a combi boiler in the loft I knocked down the wall.
I then ripped the old suite out and drylined the walls to be tiled. Builders came in to put new stud wall and door in then a spreader did a couple of walls which aren't to be tiled.
I came back to overlay with 18mm ply and do 1st fix for bath, toilet, towel rad and shower.

DSCF0741.jpg

DSCF0742.jpg

DSCF0739.jpg

DSCF0743.jpg
 
Never did post final fix pics but have just finished their hall/kitchen and they collared me to put a few things up:

DSCF0980.jpg

DSCF0982.jpg

DSCF0984.jpg

DSCF0986.jpg

DSCF0987.jpg
 
great looking job again mac, why didn't they tile wall with radiator on, i feel this makes it look unfinished no reflection on your good self 10/10 :thumbsup:
 
great looking job again mac, why didn't they tile wall with radiator on, i feel this makes it look unfinished no reflection on your good self 10/10 :thumbsup:

Not sure, I never asked, but I have come across quite a few customers who hate the idea of floor and all walls tiled as they say it would feel claustrophobic and 'institutionalized'.
I'm not sure what I prefer myself - depends on the room and tile I guess.
 

Advertisement

Weekly Email Digest

Back
Top

Click Here to Register for Free / Remove Ad