G
goz
hi guys, went to look at a floor today, 35m2 of chevron planks. Great I thought... Can't wait.... Oh hold on a minute..... Two different substrates! Suspended floor on one half and screed other half! The joint is staggered aswell! Spoke to builder who just wants to put 20mm thick polystyrene board down to accommodate his wet ufh then have me laytex over top, just wants to bridge the two subs with it, thinks it will be enough!!
Any way round this? Bearing in mind it's chevron tile and joint is staggered.
Will it fail if he proceeds like this?
Any way round this? Bearing in mind it's chevron tile and joint is staggered.
Will it fail if he proceeds like this?