I
Ian
did you install the drain mate? its not there before the ufh went down was it? cant see properly tho and whats the addy in the corners was it levled again once ditra went down in those corners?
I didn't install the drain. It was there first, UFH fitted around it. The ditra was SLC'd before tiling I think the bits in the picture are leftover adhesive from sticking the mat down. Every process had to be very accurate so that the tiles ended up flush with the drains and the falls into them worked.