B
basher
hi all need some advice,i layed about 50m2 of 600 by 600 quartz tiles last xmas with uth.the ut heating has recently been switched on and an area of about 2m2 has lifted into point in one area of the room.it was a concrete floor primed and layed a foam based insulation board which i hadnt used before with sf addy,then layed uth and tiled using sf addy (granfix) customers choice.tiles were polished quartz and layed with a 2mil grout line.i have taken 1 tile up and hardly any addy had stuck to it.can anyone recomend what to do next as i dont want to relay tiles for this to happen again thanks