Hi would like some advice , been to look at a floor 16m2, concrete two door ways, to be tiled with travertine with under floor heating lose wire, there are two crowns in the floor these are between 8-15 mm hire than the surrounding floor and a slope in one door way in the corner or 35mm below crown. Concrete is c35 so to hard to grind down thought about using slc with 3mm gravel to bulk out but can only get pea gravel would appreciate you thoughts and ideas. Thanks