I used the orbital sander to get some of the ridges down, so I've done some layouts of tiles to get an idea of the best possible layout, and I've sketched my plan attached, 2 walls are different by half an inch, so I'm planning to take half an inch from the edge of the bottom right
tile, for the grout lines to be in the same position all the way along, I plan to not do the radiator tiles, as i'll need a plumber in to remove the radiator and then I can drill threw the
tile part. I've also not planned the kitchen or bathroom as I'm guessing that they will lead on from the grout lines in the main room.
I also put down a few tiles dry to practice using the levelling system, the tiles are perfectly level, but the wedges felt like they couldn't go any further, is that correct or was I not forceful enough?
I've got 5 bags of flexible adhesive which are rapid set, I should get a delivery tomorrow of another 15 which are slow set, so maybe I can use the rapid set at the end if I'm feeling confident enough.
I've read threw this thread religiously so I think I am set, but if there are any comments on my plan or better ways of doing it I'm all ears.