Well, I've tiled 60% of bathroom walls, enough to get a bathroom fitted over it, I still need to finish the rest, and grout walls and floor in there, then I can get back to the floor in the main room. I've been ill, out of the country, had other work done and all other excuses I can think of! Hope to get cracking again tomorrow, I've been having a nightmare removing the red spacers from floor and wall, some of them aren't cracking off cleanly, so I've been trying to bang down under grout line, or wrapping a j cloth around a scraper and trying to get adhesive/spacer out that way. I also choose not to centre around window, so I'm sure I'm going to get some flack for that when I post pictures.