I would normally do a heated stone floor to the following spec:
Marmox stuck to screed with RSF
UFH Matt
Floorflex slc over cables
Uncoupling membrane stuck down with RSF
Tiles fixed with RSF
I'm quoting for 50+ sq mtrs of limestone but only 15 - 20 mtrs to be heated. In this instance the marmox and slc in the unheated area is adding significant cost. How would you do it?