4 days in and I don't feel I've made much of a dent in the huge piles of tiles I've got!!
Spent a day sorting out the concrete to get it level - had to hit it quite a bit with SLC (this was suppose to be all sorted!)
All the furniture still in the lounge, set of stairs that I had to take down with joiner (they had to go in lounge), fridge freezer, 2 dogs, kitchen units etc.. all piled in the lounge. Wanted to get all the ditra down on first day but fat chance.
No outside tap so I put one in last night to make my life easier.
Managed to finish hallway off today and get stairs back in - so managed to get more matting down so I can make a start in the lounge tomorrow.

20150312_164711_zps6gc2lpem.jpg


20150312_164903_zpslzjzcibo.jpg


20150312_164745_zps0r191fkb.jpg
 
Ha - my fingers have bled everyday so far!
First cut of the ditra and I managed to go into my thumb 😳
Today was taking the bathroom door off and it has one of those tensioned chains (can't remember what they're called)
but it was fitted at the top of the door so max tension - that bit me bad, as I was wiping all the blood off the ditra one of
the labradoodle puppies rocked up and emptied its bladder all over my fein :rant:
 
Hurrah - I'm in the lounge!

20150313_175227_zpsv6bvhzuz.jpg


20150313_175216_zpswecyj43v.jpg


That Ditra doesn't half eat up adhesive - good job I added the word 'estimate' when it came to the materials bill!
 
pain in the ***

Though in all honesty my *** is the only thing that's not hurting :sick:
 
No TJ - regular big heavy thick porcs!

Really nice tile though - I've only spotted one repeat in the glaze pattern so far and I'm working out of 10 open packs at a time.
 
End of week 2 and lounge and utilities corridor finished

20150318_165407_zpsl1awqvvb.jpg


20150318_165431_zpskkzld9qr.jpg


P1010416_zpskrdne0lm.jpg


P1010411_zpsjqjsddxs.jpg


P1010413_zpsepmovvpa.jpg


P1010412_zpsvhu9rmjf.jpg


Kitchen/diner to do next week which I'm a bit worried about as there's a built in media unit and island to go around - concerned that the levels may
be out when the tiles meet back up.
Also got a curved wall window feature thing that's going to be hard to cut round (worried I'll have to split a tile or two to get it in place.
 
Monday had to work around kitchen fitter so only managed to get the last of the Ditra laid

20150323_163354_zpsvo3mc179.jpg


20150323_163506_zpsaivy4zbx.jpg


20150323_163428_zpsdi4hhmri.jpg


20150323_163421_zpsjdbghemb.jpg


20150323_163449_zpsttrken7p.jpg
 
Tuesday dry laid some tiles to make sure grout lines meet up around media unit and island

20150324_092253_zpske4recod.jpg


20150324_092234_zpssbzn2aoj.jpg


Then got some full tiles down

20150324_175032_zpsabsf9igz.jpg


20150324_175054_zpsttljxwff.jpg
 
Took me pretty much the whole of today to just get all the cuts in! :thumbsdown:

P1010417_zpst1e9s1te.jpg


P1010418_zpsdkogv6w1.jpg


P1010421_zpswx1vpwtz.jpg


P1010420_zpsytxuvp06.jpg


P1010419_zps1oamvlxi.jpg
 
That looks like a complete nightmare. Nobody is managing the clients expectations.

TV, books, CDs all stacked up in recesses before the decoration is done or the skirts fitted. Kitchen completely filled before that's even finished. Sofa and furniture on the tiles before it's grouted. I'm all up for accommodating the client when they are trying to live in the property whilst the works are going on but that's taking it too far.

If I had quoted for that job and that is what I was faced with I would have had a word with them by now.

Sorry sir/madam I know you want everybody out of the house so you can get back on with your life but the fact is you're only extending it but slowing us down.
 
It's been a mare!
Got an entire bathroom suite piled in the hallway now. Massive fridge freezer that is apparently going on ebay (put it on ebay then and get rid ffs)
Kitchen fitter's held up 'cos he spends 1/2 his time emptying cupboards, fridges etc... only to have to put it all back later. Though it's me suffering the most - God knows how I'm going to grout it all in one day. :mad2:
 
All done bar the grouting!

20150327_173912_zps9jt8l4cm.jpg


20150327_173900_zpsb72c4rle.jpg


On the downside this is what I'm up against come grouting on Monday:

20150327_173753_zpsqlmk2gee.jpg


20150327_173804_zpse0t6rbqm.jpg


20150327_173817_zpsmkjqzw6m.jpg


20150327_173823_zpszavbqwqi.jpg


20150327_173838_zpsfcavlm3d.jpg


I've had a word but we'll see :mad2:
 
Make sure you don't get the sofa dirty :sofahide:

Looks fantastic, now that does sound like a gay word when I read it back but amazing has already been used :lol:
 

Advertisement

Thread Information

Title
PITA job
Prefix
N/A
Forum
Australia Tiling Forum
Start date
Last reply date
Replies
21

Advertisement

Tilers Forums Official Sponsors

Thread statistics

Created
macten,
Last reply from
Stocks Tiles,
Replies
21
Views
709

Thread statistics

Created
macten,
Last reply from
Stocks Tiles,
Replies
21
Views
709
Back