All I seem to do is SLC lately
 
That bit was 18 1/2
Already used 13 on another bit.
Reckon another 9 or 10 once the rest of the old kitchen is out.
One of those jobs I have to keep dropping in on as it's all got to be done for xmas. Bi fold doors are holding me up atm. Customer needs somewhere to store new kitchen so ripped a bit of the old one out to level and tile so they have some space. Then I've got to rip rest out, level and tile then temporarily put it back in for use until kitchen fitters are ready. Back to front way of doing things but if we did it the proper way he'd be looking at Feb before it's all done. Going to cover and protect it all with some ply. Not moaning though as I'm on day rate and I'm now at 94% x box one treat goal with Weber points 😉
 