M
Mr Tiler
does that come out of your pocket or is it added to the final bill? or do you quote it before hand mate? cheers.
some tilers Should be ashamed of themselves. So you don’t fit backer board or SLC or patch walls or cut architrave or fit UFH or install tanking. When you have a floor that needs strengthening how do you cope if you cant even cut a plinth. I have heard some rubbish spouted in my time but this is just pathetic.
no disrespect meant at all when I say this brian but how many jobs have you potentially lost by doing this? if you need to get another tradesman in is that not going to put the customer off most of the time? cheers
skip them, then tell them to get a joiner in to hang a new one :lol:
It's just the same Tea Bag, there should be enough rail to trim the bottom of the door down by 5, 10, 20mm. If there isn't because it's been hung in correctly and you can't repostion the rail then by all means pass it up and tell them it's not something you can do. But that is on the rare ocassion, so no need to turn down the other 99 times it isn't an issue.
I wouldn't expect tilers to start re-hanging doors, ffitting kicthens, plastering whole rooms but the very basic jobs shouldn't be any issue at all.
All you're doing is making life harder for your customers by telling them to get all these extra trades in to do tiny jobs which they will charge a premium for as it takes longer to drive to the job than it actually takes to do it.
It goes on the quote just before accessory fitting
do you mean you write it up on the quote under 'accessory fitting'? I don't think I got that one sorry mate