JordanLincs
TF
So it's morning time and everything seems okay i think. However, the top layer is soft-ish (sratches with a screw driver). To be fair its about 5c° so I think it's a combination is a weak-ish mix and very cold temps as to why the top layer is a bit soft? It feels like one more day and it will be rock hard
Secondly is not as flat as I'd like. I was planning on fixing a batten to the door and putting down another layer. I need to wait and see if it gets more solid. Do I need to prime again?
Secondly is not as flat as I'd like. I was planning on fixing a batten to the door and putting down another layer. I need to wait and see if it gets more solid. Do I need to prime again?