Hi all newbie here so take it easy on me :smilewinkgrin:
Ok so just ripped out an existing shower , it had recentlystarted leaking through to downstairs . Originally done by a " proper " tiler , so thought to myself , with the right advice , i think i could do a better job myself .
This is were you guys come in
I will try and stage my questions as work progresses rather than bombard everyone with 101 questions right at the start .
So to start the floor needs re-tiled , slight bit of water damage on existing chipboard floor .
Am i better to lift and replace whole floor with WBP ply and treat the ply with Bal bond SBR ?
I have attached a couple of pics which i hope will help
Many thanks Gixer
Ok so just ripped out an existing shower , it had recentlystarted leaking through to downstairs . Originally done by a " proper " tiler , so thought to myself , with the right advice , i think i could do a better job myself .
This is were you guys come in
I will try and stage my questions as work progresses rather than bombard everyone with 101 questions right at the start .
So to start the floor needs re-tiled , slight bit of water damage on existing chipboard floor .
Am i better to lift and replace whole floor with WBP ply and treat the ply with Bal bond SBR ?
I have attached a couple of pics which i hope will help
Many thanks Gixer