Swimming pool job... All in travertine.

Tilers Forums Official Sponsors

Dave, Thats a superb job m8, it helps us newbies to see what we should be aspiring to achieve. How long did it take you to do?:thumbsup:

About 14 days all in.. but a lot of time was taken up bull nosing and polishing tile edges.

The pool wall was too self level as you see in opening page and an un-coupling membrane used as pot/beam floor and i didn't want lateral stress cracking the stone.

Tanking of the shower wall was done..loads and loads of little finishing bits , so it is time consuming but worth the finished product..
 
About 14 days all in.. but a lot of time was taken up bull nosing and polishing tile edges.

The pool wall was too self level as you see in opening page and an un-coupling membrane used as pot/beam floor and i didn't want lateral stress cracking the stone.

Tanking of the shower wall was done..loads and loads of little finishing bits , so it is time consuming but worth the finished product..

If you had changed your dentures half way threw you would have finished that bullnosing in 2 days:lol:
top job m8 :thumbsup:
 
Crackin job bruv if the kitchen i am fitting there looks half as good as that ive done a good job well done again :thumbsup:
 
Sorry Dave, after the holls I'm still playing catch up. Just seen the pics, you should be very poud of your skills. top class job:hurray:
 

Advertisement

Weekly Email Digest

Back
Top

Click Here to Register for Free / Remove Ad