D
dangerSteve
Hello fellas,
Im on a job at the moment and Im about to start on the travertine tiling, ive got both the walls and floor to fix. The substrate is nomoreply with ditra ontop fixed using kerraquick with addy, im also going to use kerraquick with milk to fix the travertine to the ditra. The travetine tiles are 400x400 and 15mm thick (i think) and these are being layed in a standard format with 2mm joints. Obviously the joints on the floors need to match up with the joints on the walls, but which do I tile first to make it simplest to keep the joints lined up?? I'm thinking logically the floor first would be easier but im not happy about working ontop of the travertine floor when it comes to fixing the walls???
Any ideas??
Im on a job at the moment and Im about to start on the travertine tiling, ive got both the walls and floor to fix. The substrate is nomoreply with ditra ontop fixed using kerraquick with addy, im also going to use kerraquick with milk to fix the travertine to the ditra. The travetine tiles are 400x400 and 15mm thick (i think) and these are being layed in a standard format with 2mm joints. Obviously the joints on the floors need to match up with the joints on the walls, but which do I tile first to make it simplest to keep the joints lined up?? I'm thinking logically the floor first would be easier but im not happy about working ontop of the travertine floor when it comes to fixing the walls???
Any ideas??