dave l and l
commuting 56 mile one way to work for a large contractor
small 100 x200 johnsons presmatics tile going up brick bond .50 m2 for phase 1
managed to tile two rows and noticed all the tiles were bowed in middle. it has took four different guys 8 hours to decide that they need to have a meeting about the tiles and decide what way they want to put them up. if i had much hair i think i would have pulled it all out,
anyone else had this bother with these tiles
small 100 x200 johnsons presmatics tile going up brick bond .50 m2 for phase 1
managed to tile two rows and noticed all the tiles were bowed in middle. it has took four different guys 8 hours to decide that they need to have a meeting about the tiles and decide what way they want to put them up. if i had much hair i think i would have pulled it all out,
anyone else had this bother with these tiles