T
The Legend; Phil Hobson RIP
Sad for the customer, music to these old ears
Sorry Dave but I think you underestimated!
Hardie Boards 6mm trowel - 1bag = 6sq mts = 10bags
Dural Ci 3mm trowel - 1bag = 12sq mts = 5bags
Tumbled limestone - 1bag = 3/4sq mts = 15/20bags
I therefore conclude that without the benifit of seeing this job I would estimate the no. of bags of adhesive at 30-35no.
This amount has no technical relevance whatsoever and is purley a figure picked out of the depths of personnal experience and would be the determining factor that I would employ to estimate a project given the information supplied.
I hope the customer kept the empty bags!:lol:
Sorry Dave but I think you underestimated!
Hardie Boards 6mm trowel - 1bag = 6sq mts = 10bags
Dural Ci 3mm trowel - 1bag = 12sq mts = 5bags
Tumbled limestone - 1bag = 3/4sq mts = 15/20bags
I therefore conclude that without the benifit of seeing this job I would estimate the no. of bags of adhesive at 30-35no.
This amount has no technical relevance whatsoever and is purley a figure picked out of the depths of personnal experience and would be the determining factor that I would employ to estimate a project given the information supplied.
I hope the customer kept the empty bags!:lol: