G
Gazzer
One of my mates who is the IT game has had me do some tiling for him in the past on a number of jobs. Everytime he always want diamond set and borders. It is never simple with him. Well he has just moved house again and wants some work done. 1st job is a small bathroom floor. Its only about 3m2 but he wants travertine with a glass mosaic border. The travertine is 12mm and the mosaic is 7.5mm. The floor is a chipboard floor so I have said it needs backerboard as its solid. I also need to back up the difference in heioght between the 2 types of tile. Now I can either fill the difference where the mosaic will be going with adhesive and use the notched out piece of wood method or make the height with backerboard....anyway , either way its extra work. All he sees is its about 3m2 and should take me no time at all. Further more he wants me to cut around pan and pedestal and doesnt want them removed....so that would be more work.
I have explained all the issues and stated that all in it would take the best part of 2 days but that would include removing pan and pedestal ( unless there were other issues)
Now do you think I am being unreasonable ? I know its only a small job but I think to do it right then it will be over the one day he is expecting. Of course I am asking 2 days money and his point is that I tiled a kitchen floor for him last year and that it was 12m2 and I got it all done in one day...but it was fairly easy.
Anyway here is a sketch of what he wants, bare in mind that there is a pan and ped in there too and notice the whole bathroom is at an angle !!!!
I have explained all the issues and stated that all in it would take the best part of 2 days but that would include removing pan and pedestal ( unless there were other issues)
Now do you think I am being unreasonable ? I know its only a small job but I think to do it right then it will be over the one day he is expecting. Of course I am asking 2 days money and his point is that I tiled a kitchen floor for him last year and that it was 12m2 and I got it all done in one day...but it was fairly easy.
Anyway here is a sketch of what he wants, bare in mind that there is a pan and ped in there too and notice the whole bathroom is at an angle !!!!