I feel like a dumba$$ as ive literally just posted the same question!
I had a gyvlon screed layed over my ufh, and now I realise that it needs sanding and priming before tiling. . Doh !! I was just told it takes a day per mm to dry out.
Anyhow, my system has not been on yet so may not be as tough as yours. But I now need to get sanding asap!!
On inspecting the surface, I can see a few black bits which look like rubber! I assume this is the type of thing we need to remove !?
I had a gyvlon screed layed over my ufh, and now I realise that it needs sanding and priming before tiling. . Doh !! I was just told it takes a day per mm to dry out.
Anyhow, my system has not been on yet so may not be as tough as yours. But I now need to get sanding asap!!
On inspecting the surface, I can see a few black bits which look like rubber! I assume this is the type of thing we need to remove !?