One for Keith at u heat I think. Or of course any one knowledgeable about part p
If I were to put an electric cable underfloor heating system into my screed and hard wire it through a stat into a spur it would be classed as a fixed wiring circuit and would become notifiable to building control under part p.
if on the there and instead of hard wiring it from the stat to the spur I were to put a 13a plug on it and plug it into a socket do you know if the same rules would apply??
If I were to put an electric cable underfloor heating system into my screed and hard wire it through a stat into a spur it would be classed as a fixed wiring circuit and would become notifiable to building control under part p.
if on the there and instead of hard wiring it from the stat to the spur I were to put a 13a plug on it and plug it into a socket do you know if the same rules would apply??