Marvo
Day 4. A little more productive than day 3....which isn't saying much.
- Switch off water to house and drain pipework.
- Get sidetracked by a previously undiscovered back-syphoning issue between the split water supplies feeding the house. (Most of the house is fed by borehole water, the kitchen only is fed by municipal water....or so I thought until I accidentally discovered otherwise this morning.)
- Dry-fit basin and install 40mm drain pipework.
- Make lightly seared sesame tuna steaks for lunch.
- Reroute 22mm main plumbing feed to a more convenient route and tee in for basin and shower.
- Install 15mm hot and cold pipes to below basin fit angle valves.
- Install 15mm pipework for shower taps and cap-off for now.
- Cement pipework chases where possible.
- I'm a painfully slow plumber.
- Anytime you really need some time without interuptions a customer is guaranteed to phone with an emergency that means you have to drop everything.