Yes spoke to them they are proposing to just do the one wall and the floor but there is a multitude of sins and I feel a full rip out is needed and is within rights of asking for going by the pictures I've shown..... They came down and Brought tiler with them coukd be anyone I guess but what he said that one wall where old tiles are under the plasterboard there was excessive lapping he said and thr floor needed done again and when I was pointing out other things he was brushing it off..... Also dave when using plasterboard in a shower area is there regs on what they have to use as it's all bog standard 12.5mm plasterboard
Thanks