S
Spud
went to a job today to ditra a floor ready for tiling tomorrow ,I spoke with the foreman several weeks ago when they were screeding and explained the screed would need to be sr1 and above as we are using large format thin porcelain tiles ,he assured me they were getting a professional in and it would be top notch,
Arrrived on site this morning to see a 50m2 area what can only be described as very poor done by a so called screeder, it turns out they let the plasterer have a bash at it ,checked with a straight edge the floor is terrible and checked with a laser it goes form plus 15mm to minus 20 from datum ,the plasterer looked embarassed and tried to claim that the site manager had told him to slope the floor in one corner which turned out to be rubbish as it is a dogs dinner and there is no way a straight edge rule went near the floor ,I will take some pictures of it tomorrow when I rectify it ,costs involved 45 bags of webber floor flex levelling compound and 16 hrs labour ,
another example of trying to save £30-40 pounds has ended up costing nearly £1000
Arrrived on site this morning to see a 50m2 area what can only be described as very poor done by a so called screeder, it turns out they let the plasterer have a bash at it ,checked with a straight edge the floor is terrible and checked with a laser it goes form plus 15mm to minus 20 from datum ,the plasterer looked embarassed and tried to claim that the site manager had told him to slope the floor in one corner which turned out to be rubbish as it is a dogs dinner and there is no way a straight edge rule went near the floor ,I will take some pictures of it tomorrow when I rectify it ,costs involved 45 bags of webber floor flex levelling compound and 16 hrs labour ,
another example of trying to save £30-40 pounds has ended up costing nearly £1000