nust imagine the amount of get out clauses Mapei can say if it fails,
"Sorry not prepped right"
"Sorry we have tested the addy and the water/additive ratio is wrong"
"Sorry the primer is to weak/strong"
"Sorry the original floor was loose"
"Sorry to many contaminants on original floor"
It be Like trying to get money out of your house/car insurance , a long hard slog😡
Having said that, if it's prepped right, the tiles are solid, as in they break up with a jcb in little pieces , the floor will be fine 🙂
"Sorry not prepped right"
"Sorry we have tested the addy and the water/additive ratio is wrong"
"Sorry the primer is to weak/strong"
"Sorry the original floor was loose"
"Sorry to many contaminants on original floor"
It be Like trying to get money out of your house/car insurance , a long hard slog😡
Having said that, if it's prepped right, the tiles are solid, as in they break up with a jcb in little pieces , the floor will be fine 🙂