S
stevee
fella rung me sunday ,wants to price a job, 21m2 of travertine
he says the floor is half concrete ,the other half is concrete but stepped down,a chippy has made the level marry up with ply ect...
so regarding a movment joint, if he dosent want a metal or plastic strip schutler type ,down the centre of the room,could i use coloured mastic?
or am i talking from my unmentionable:smilewinkgrin:
any other ideas boys?
cheers steve
he says the floor is half concrete ,the other half is concrete but stepped down,a chippy has made the level marry up with ply ect...
so regarding a movment joint, if he dosent want a metal or plastic strip schutler type ,down the centre of the room,could i use coloured mastic?
or am i talking from my unmentionable:smilewinkgrin:
any other ideas boys?
cheers steve