Discuss What a bodge up in the bathroom in the Bathroom Tiling Advice area at TilersForums.com.

L

lawrenso

Hi Guys,

I am working away at the moment and had a tiler in doing the bathroom. The tiles are 600*300 Youngstone laid in landscape in porcelain from CTD in two colours - light in the middle (4 high) with dark top (1.5) and bottom (2) - with strips of square glass mossiac inbetween the different colour changes (so two strips)

The first weekend I got home and looked at what I could see and had to pull him up on the fact that he bad but the quarter round beading over both the cut outs for the hinges and also over the door catch striking plate. Could not really tell what the rest was like due to it still being battened out.

last weekend - I got home and found a mess basically.He had osrted the hinges out but not the striking plate

He has tilled the wall around the window. at the bottom he is quite on although the cut edges are very rough and uneven. On the left hand side of the window, the tile edge runs away from the window to stand proud by a aprox 1cm from the window edge. Also, along the top and down the right hand side edge he has used spotting. I have checked with my own spirit level (2 mtr) and found that it is the tiles that are angled away from the wall - not vice versa. In the top right hand corner of the window I can stick my little finger in towards the first knuckle and you can actually look down the gap and see the spot fixing and bare wall and tiles. I also do not see how he can put the beading

Also, worringly you can look down the gap and see the bits of board he has had to use to pad out for the glass beads.

We have had him leave out the tiles around where the bath is going to be fitted, and where the head of end of the bath is you can feel a simular gap where you can get a little finger in. It also appears that he has only used a 6mm bed from what I can see

Also, there is differences in levels - ie the bottom two tiles are forward of the 4 beige above by about 4-5mm leaving a noticable ledge, and a lot of the glass mosaics are very proud or sunk and even twisted.

I would say that out of the whole room, one wall is good.

Now I have approached him on this and he has blamed the walls. However, I prepped the walls, removing the old tiles, the emulsion (was only half tiled), making good, WPB tanking etc and although I would say they weren't totally perpindicular there were in a pretty good condition. 2 walls are wet plastered and two are plasterboard on studs (screwed). He told me that he has had to spot out up to 1/2" behind some tiles, and there is nothing he can do about it.

To me it looks like he has gone out with a tile and then it has grown bigger and bigger - perhaps because of the 6mm bed.

He also planed the door edge (not the top or bottom) and kn%&"*ered that so we need a new door now:furious3:

So here are my questions

1. Should the tiler inform you before starting if the walls are out (I believe yes to indemnify himself)
2. Grouting - these are a rectified edge tile - should it be grouted to the surface?
3. Should the grouting be done before the job is finished and should the grouting go the full thickness of the tile/mosaic (as ours isnt even 1mm thick in places you can stick your nail through it).
4. What come back have I got on the guy ie if we need to have tiles removed etc.. to put the job right

This guy has been trading for a few years (lives local)

All help and advice welcome

Cheers

Steve
 

Attachments

  • wall design.JPG
    wall design.JPG
    29.2 KB · Views: 242
M

mikethetile

hi steve

id just like to apologise for the tone of my post

i take my work seriously and always do the best i can for my clients

seeing your pics and knowing how much the materials cost made my blood boil

my anger came through on the post and it shouldnt have done as my anger is definitly not directed at you

if id thought about it i could have worded it better

im sorry you ended up with such an awfull job

please accept my apologies

mike
 
Last edited by a moderator:
L

lawrenso

hi steve

id just like to apologise for the tone of my post

i take my work seriously and always do the best i can for my clients

seeing your pics and knowing how much the materials cost made my blood boil

my anger came through on the post and it shouldnt have done as my anger is definitly not directed at you

if id thought about it i could have worded it better

im sorry you ended up with such an awfull job

please accept my apologies

mike

Hi Mike,

no need to apologise mate :thumbsup: - I do have to take some of the responsibility for this - please don't worry, I didn't take it the wrong way. In fact - thank you for caring so much about it.

I just wish the tiler had of shown some responsibility on his part and turned down the job as being beyond him or stopping when he realised it :mad2:

Hey ho - that's life boy (do they still make that soap any more???)

Cheers

Steve
 
L

lawrenso

As a further update, please see below the letter that I am sending to the guy today at great cost (imagine the next day postage price from Germany :yikes:)
As you are aware, we are very dissatisfied with both the safety aspect and also the finish of the tiling job that you have carried out in our bathroom at the above address. Please find below the reasons for our dissatisfaction.

1. Spot fixing (Dot and Dab) of Tiles. This is not a recognised fixing method under BS5385 and is especially dangerous considering the large format porcelain tiles. You have stated that this is due to the walls being out. We feel that it was your responsibility to ensure the walls were in a good condition for fixing tiles before commencing to lay tiles. You only informed my wife that one wall was "a little bit out" - and this was after you had tiled it. This wall, to be honest is the best of the job!
2. The actual fixing of the tiles has not resulted in an even and level surface with excessive lipping with sunken/proud corners and edges.
3. A number of Mosaic Tiles have been scratched excessively during installation.
4. The mosaic tiles have been fitted so they are not even and level with the surface of the tiles adjacent, alternating between excessively proud and sunk within inches of each other.
5. The grouting on the walls is poor and is very bare in some areas and can easily be pushed out.
6. Although the bath was not fitted, it was available for measuring, however you have spaced the tiles and mosaics to that only a poor finish can be obtained around the bath - to clarify further - the mosaics would finish about 1cm above the bath and would leave an excessively large grout line.
7. The grouting to the floor appears to be very grainy, and there are areas where the grout has not been laid consistently.
8. The level of the floor tiles near the door needs to be rectified.
9. You have grouted the walls of the bathroom before the job was finished. This will create areas where further grout may not bond to the existing grout correctly - and leave a weakness for water to permeate, especially around the area of the bath.

On highlighting 1, 2 and 4 above with yourself on Sunday 8th February you said that there was nothing further you could do and it was our problem as the walls were out, and you have re-iterated this during our telephone conversation on 23rd February, but now deny "dot and dabbing" although the evidence is very apparent, and stating that you are completely satisfied with the work you have carried out. You did not offer to even rectify any problems.

Unfortunately we now believe that the complete job needs to be completely re-done, and after seeking the advice of trading standards, they have informed us that under Section 13 of the Supply of Goods and Services Act 1982, all services provided must be carried out using reasonable care and skill. We now give you notice that we now require you to rectify your work by Friday 6th March 2009, at your cost. If not, we will instruct other agents to do the required work and will seek compensation from yourself. If you wish to certify your quality, please feel free to contact The Tile Association (TTA - www.tiles.org.uk) for them to come and inspect, I believe the cost is around £800 +VAT, but again this needs to be carried out and a verbal report given by 6th March 2009. The TTA assist in the drawing up the British Standards.

We are not happy at taking this course of action, however we feel that we have been left no option by yourself. To be frank, we would of had a lot of respect for you if you had admitted that the elements of this particular job was beyond you.
 
L

lawrenso

Hi Lawrenso,After reading your letter I would`nt be suprised if he comes round offering to rectify his bad workmanship! Would you let him? :8:2Balls

To be honest - he can rip the tiles off the wall (any damage to the floor would need to be rectified as well - I plan this to be a two man job to minimize damage) and replace the tiles and call it quits at that.... I will sort the walls and pay the new tilers. I think that is a very fair "minimum".

I would not let him put a tile on the walls if my life depended upon it though. If he does not come up with an offer or it is unnaceptable - it would be off to the small claims court and then I would go for every penny - including the 41 Euro's it just sent to post that letter :yikes:, my lost income (contractor read self employed) etc....

I think that I worded it pretty well.....I especially like the bit about the TTA inspection- Thanks to Dave for that - I have also spoken with them - I have the evidence of his spot fixing already - he would have to disprove it.

Steve :hurray:
 
L

lawrenso

:lol::lol::lol::lol:
Hi Steve,
Fair enough,reguarding his spot fixing there is enough evidence on the forum! Was that ply behind the mosiac as well. I hope you don`t have to wait to long for a satisfactory outcome.May you bath in Peace!:8:2Balls

I dream of having a bath:drool5:....I am a shower man but you know what it is like when you are denied something - you want it even more (even if you didn't want it to start with!!!)

To be honest I miss seeing the kids playing in the bath - a 760mm shower cubicle is not the same thing - for them or for us....

Thanks

Steve
 
L

lawrenso

Hi Guys

new update for you. I have received a letter in response to my letter above and have scanned it and attached.
(addresses removed_)

I have spoken on the phone with him and he is saying about using a mortar gun to inject cement behind the tiles even though he denies spot fixing and only padding out the tiles. He is also trying to bend and omit the truth. We have a meeting here tomorrow at 10am although he has restated that he is totally happy with his work

Having spoken with Consumer direct on this - I can even use this thread in evidence against him. Also, I need to have a professional report carried out and this can be done from photographs. I have PM'd Dave offering this work to him first as he has been a great help :thumbsup:.

I will continue to keep you updated guys

Cheers

Steve
 
Last edited by a moderator:

Reply to What a bodge up in the bathroom in the Bathroom Tiling Advice area at TilersForums.com

Subscribe to Tilers Forums

There are similar tiling threads here

There's a video on youtube of a guy templating for large format floor tiles, and I get the...
Replies
0
Views
333
Had new bathroom by a builder who has subsequently gone bust and after 6 months the floor has...
Replies
4
Views
446
    • Like
We had a wet room fitted by a large company. We have issues with a few large steps where the...
Replies
3
Views
738
First time tiling, lots of mistakes, but most of them have been resolved in a timely fashion so...
Replies
3
Views
479
Hi. Hoping you al. Can help me. I have an issue where I had a bathroom built and a shower...
Replies
8
Views
1K

Advertisement

Thread Information

Title
What a bodge up in the bathroom
Prefix
N/A
Forum
Bathroom Tiling Advice
Start date
Last reply date
Replies
65
Unsolved
--

Thread Tags

Which tile adhesive brand did you use most this year?

  • Palace

    Votes: 9 5.5%
  • Kerakoll

    Votes: 17 10.3%
  • Ardex

    Votes: 12 7.3%
  • Mapei

    Votes: 46 27.9%
  • Ultra Tile

    Votes: 21 12.7%
  • BAL

    Votes: 39 23.6%
  • Wedi

    Votes: 4 2.4%
  • Benfer

    Votes: 4 2.4%
  • Tilemaster

    Votes: 22 13.3%
  • Weber

    Votes: 19 11.5%
  • Other (any other brand not listed)

    Votes: 17 10.3%
  • Nicobond

    Votes: 8 4.8%
  • Norcros

    Votes: 2 1.2%
  • Kelmore

    Votes: 5 3.0%
Top